Home > Projects > Tunnels > Ankara Subway Tunnels

ANKARA SUBWAY TUNNELS

11,000 linear meters of cracks were repaired with Xypex Patch'n Plug to stop water ingress through the construction joints of this tunnel.

A surface area of 5,600 m2 was waterproofed with Xypex Concentrate and Modified.