AOMORI BAY BRIDGE

The Aomori Bay Bridge, measuring 25 m in width and 1,219 m in length, is exposed to salt from the ocean causing damage to the pre-cast concrete girder box main beams.

Xypex was applied to the bottom plate of the main girder from the inside of the girder box and to the upper surface of the bottom plates. The result is a permanently waterproofed structure that is impervious to the elements.