CRONULLA MARINA

Dosed at 4 kg/m3 with Xypex Admix C-2000 NF, this mix was designed to achieve 32 MPa at 48 hours and 50 MPa in seven days.

The two-tonne post-tensioned units of this floating concrete structure had to be lifted from their formwork 36 - 48 hours after casting.